Two more projects were completed this week, one in Perry and one in Steinhatchee.  In Perry, the damaged laundry room was rebuilt and ceramic tiles were installed on the floor.  Leonard and Jonathan did a beautiful job there. In Steinhatchee, two large decks were completed, one open and one covered.  The crew was able to reuse the existing ramps on both decks and did a great job creating the perfect outdoor living space for the client.  Another flooring job in Steinhatchee is almost finished.
This coming week we start on a very large project, redoing all of the rooms in a house on stilts in Steinhatchee: drywall, floors, cabinets and a lot of painting.  The storm surge drove 2 feet of water into this elevated home.  Our entire team will be working on this one for a couple of weeks.
Perry continues to be chilly, with a warm day here and there, but spirits are high and work is getting done at an amazing rate.  God is so good!

Related Reports

See More Weekly Reports

Videos

See More Videos