Much was accomplished this week. The McAllister home is near completion, with touchup painting and trims left to do. Mary’s home continued to be roughed in and plumbed this week. Mudding and sanding continues, and we hope to finish that next week. At the Diggles home, a large crew worked together to hang drywall and do mudding, replace light switches, frame the master bedroom. Tubs were installed and water lines were installed and hooked up. The utility room floor was replaced, and window boxes and sills were installed.

The highlight of the week was our Thanksgiving dinner, provided by the Jasper United Methodist Church of the Pines. The Church has been so very generous with us and our fellowship together was very sweet.